{"id":4076,"date":"2021-06-11T07:11:51","date_gmt":"2021-06-11T11:11:51","guid":{"rendered":"https:\/\/www.wwfry.org\/?p=4076"},"modified":"2021-06-10T22:10:43","modified_gmt":"2021-06-11T02:10:43","slug":"build-11-june-update","status":"publish","type":"post","link":"https:\/\/wordpress.wwfry.org\/?p=4076","title":{"rendered":"Build 11 &#8211; June Update"},"content":{"rendered":"<h2>$4445 Raised towards the $50,000 challenge!<\/h2>\n<p>During the week of May 11, some great progress was made by the Build 11 Project team. The entire team was at Sheepscot at various times during the week, and a significant number of components for the rear frame of the locomotive were created.<\/p>\n<p>Over three intensive days, we were able to manufacture more than 20 items. We used propane torches to heat steel ships and then formed them on the shop flanging machine. Most of the parts were in pairs; and in several cases, there were right-hand and left-hand pieces. That required the repositioning of stops on the machine to assure that the work piece did not move once the bending process began.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/static.fundrazr.com\/story\/4e8c279ad11a49319946b944fa857b4e.jpg\" \/>Some pieces needed bends at both ends or to be bent into an elongated \u201cU\u201d shape. Some of the shapes were made from larger and heavier steel \u2014 some one inch thick and seven inches wide \u2014 we used two propane torches for heating, one above and one below. These large pieces were a challenge to handle, due not only to their weight but also because after the initial heat and bend, the other end likewise needed to be heated and formed.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/static.fundrazr.com\/story\/535df5c23b454a4bafaa80f6b2f96633.jpg\" \/>When we had completed all we could, we stacked all the parts on a pallet and moved it to storage in the No. 11 container. In addition to the actual making of these components, we reorganized and consolidated items stored in the No. 11 Project container, moving recently-delivered items into covered storage. Most of these items arrived by motor freight from Aquacut, a water-jet cutting operation in Syracuse, NY.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/static.fundrazr.com\/story\/7f10d6583b3940d3ab7ecccca6f5382d.jpg\" \/>Since the announcement of the $50,000 challenge 30 days ago, you have raised $2222 in new donations! This includes $222 in\u00a0<a href=\"http:\/\/www.wwfry.org\/raffle\" target=\"_blank\" rel=\"nofollow noopener\" data-oembed=\"false\">raffle ticket sales for the replica locomotive #7 builder&#8217;s plate<\/a>.<\/p>\n<p>With the match from the generous anonymous donor, the challenge now stands at $4445!<\/p>\n<p><a href=\"http:\/\/www.build11.org\" rel=\"attachment wp-att-4080\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-4080\" src=\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/Building-Steam-Challenge-2.png\" alt=\"\" width=\"750\" height=\"1200\" srcset=\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/Building-Steam-Challenge-2.png 750w, https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/Building-Steam-Challenge-2-188x300.png 188w, https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/Building-Steam-Challenge-2-640x1024.png 640w\" sizes=\"auto, (max-width: 750px) 100vw, 750px\" \/><\/a><br \/>\nWe have 5 months left to raise the remaining $22,777 to take full advantage of the match. Please keep the Build 11 project &#8220;on track&#8221; and donate at <a href=\"http:\/\/www.build11.org\" target=\"_blank\" rel=\"nofollow noopener\">www.build11.org<\/a><\/p>\n<p>Just for fun, here\u2019s a photo of the Build 11 team, including, seated, Wayne Laepple and Alan Downey, and Rick Sisson, Gordon Cook,\u00a0\u00a0Jason Lamontagne and Harold Downey.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/static.fundrazr.com\/story\/66f33e85816a4846bd7a7552cb62c35c.jpg\" \/>In other news, the Build 11 Team is planning to hold monthly two or three-day work sessions to advance the project. However, the first priority is to complete the final flanging projects for No. 10\u2019s boiler. That includes completing the flue sheets and forming the throat sheet. Then those parts will be taken to Maine Locomotive &amp; Machine Works to be included in the new welded boiler for the engine.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>$4445 Raised towards the $50,000 challenge! During the week of May 11, some great progress was made by the Build 11 Project team. The entire team was at Sheepscot at various times during the week, and a significant number of components for the rear frame of the locomotive were created. Over three intensive days, we &hellip; <a href=\"https:\/\/wordpress.wwfry.org\/?p=4076\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Build 11 &#8211; June Update<\/span> <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":4077,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[29,1],"tags":[],"class_list":["post-4076","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-build-11","category-general-museum-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.2 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Build 11 - June Update - WW&amp;F Railway Museum<\/title>\n<meta name=\"description\" content=\"The WW&amp;F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/wordpress.wwfry.org\/?p=4076\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Build 11 - June Update - WW&amp;F Railway Museum\" \/>\n<meta property=\"og:description\" content=\"The WW&amp;F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/wordpress.wwfry.org\/?p=4076\" \/>\n<meta property=\"og:site_name\" content=\"Wiscasset, Waterville &amp; Farmington Railway\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/WWFRailway\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-11T11:11:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1222\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"wp_admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@WWFRailway\" \/>\n<meta name=\"twitter:site\" content=\"@WWFRailway\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"wp_admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#article\",\"isPartOf\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076\"},\"author\":{\"name\":\"wp_admin\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/80ee68ec9b0c4345f85bde573a02fb5c\"},\"headline\":\"Build 11 &#8211; June Update\",\"datePublished\":\"2021-06-11T11:11:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076\"},\"wordCount\":431,\"publisher\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/#organization\"},\"image\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg\",\"articleSection\":[\"Build 11\",\"General Museum News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076\",\"url\":\"https:\/\/wordpress.wwfry.org\/?p=4076\",\"name\":\"Build 11 - June Update - WW&F Railway Museum\",\"isPartOf\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage\"},\"image\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage\"},\"thumbnailUrl\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg\",\"datePublished\":\"2021-06-11T11:11:51+00:00\",\"description\":\"The WW&F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.\",\"breadcrumb\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/wordpress.wwfry.org\/?p=4076\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage\",\"url\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg\",\"contentUrl\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg\",\"width\":2560,\"height\":1222,\"caption\":\"The Build 11 Leadership Team\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/wordpress.wwfry.org\/?p=4076#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/wordpress.wwfry.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Build 11 &#8211; June Update\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#website\",\"url\":\"https:\/\/wordpress.wwfry.org\/\",\"name\":\"Wiscasset, Waterville &amp; Farmington Railway\",\"description\":\"Rebuilding Maine History\",\"publisher\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/wordpress.wwfry.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#organization\",\"name\":\"Wiscasset, Waterville, and Farmington Railway Museum\",\"url\":\"https:\/\/wordpress.wwfry.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2019\/01\/WWF-Logo.jpg\",\"contentUrl\":\"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2019\/01\/WWF-Logo.jpg\",\"width\":480,\"height\":144,\"caption\":\"Wiscasset, Waterville, and Farmington Railway Museum\"},\"image\":{\"@id\":\"https:\/\/wordpress.wwfry.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/WWFRailway\",\"https:\/\/x.com\/WWFRailway\",\"https:\/\/www.instagram.com\/WWFRailway\/\",\"https:\/\/www.linkedin.com\/organization\/15554710\",\"https:\/\/www.pinterest.com\/WWFRailway\/\",\"https:\/\/www.youtube.com\/c\/WWFRailway\",\"https:\/\/en.wikipedia.org\/wiki\/Wiscasset,_Waterville_and_Farmington_Railway\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/80ee68ec9b0c4345f85bde573a02fb5c\",\"name\":\"wp_admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/cf4000b05b6475a8130ddae7e713d249847d0aca668b58f3f39e07e33480a558?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/cf4000b05b6475a8130ddae7e713d249847d0aca668b58f3f39e07e33480a558?s=96&d=mm&r=g\",\"caption\":\"wp_admin\"},\"url\":\"https:\/\/wordpress.wwfry.org\/?author=1\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Build 11 - June Update - WW&F Railway Museum","description":"The WW&F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/wordpress.wwfry.org\/?p=4076","og_locale":"en_US","og_type":"article","og_title":"Build 11 - June Update - WW&F Railway Museum","og_description":"The WW&F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.","og_url":"https:\/\/wordpress.wwfry.org\/?p=4076","og_site_name":"Wiscasset, Waterville &amp; Farmington Railway","article_publisher":"https:\/\/www.facebook.com\/WWFRailway","article_published_time":"2021-06-11T11:11:51+00:00","og_image":[{"width":2560,"height":1222,"url":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg","type":"image\/jpeg"}],"author":"wp_admin","twitter_card":"summary_large_image","twitter_creator":"@WWFRailway","twitter_site":"@WWFRailway","twitter_misc":{"Written by":"wp_admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/wordpress.wwfry.org\/?p=4076#article","isPartOf":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076"},"author":{"name":"wp_admin","@id":"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/80ee68ec9b0c4345f85bde573a02fb5c"},"headline":"Build 11 &#8211; June Update","datePublished":"2021-06-11T11:11:51+00:00","mainEntityOfPage":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076"},"wordCount":431,"publisher":{"@id":"https:\/\/wordpress.wwfry.org\/#organization"},"image":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage"},"thumbnailUrl":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg","articleSection":["Build 11","General Museum News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/wordpress.wwfry.org\/?p=4076","url":"https:\/\/wordpress.wwfry.org\/?p=4076","name":"Build 11 - June Update - WW&F Railway Museum","isPartOf":{"@id":"https:\/\/wordpress.wwfry.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage"},"image":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage"},"thumbnailUrl":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg","datePublished":"2021-06-11T11:11:51+00:00","description":"The WW&F project to build locomotive number 11 - June 2021 update. Parts are fabricated; matching fundraising challenge stands at $4445.","breadcrumb":{"@id":"https:\/\/wordpress.wwfry.org\/?p=4076#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/wordpress.wwfry.org\/?p=4076"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wordpress.wwfry.org\/?p=4076#primaryimage","url":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg","contentUrl":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2021\/06\/team-scaled-e1623375748708.jpg","width":2560,"height":1222,"caption":"The Build 11 Leadership Team"},{"@type":"BreadcrumbList","@id":"https:\/\/wordpress.wwfry.org\/?p=4076#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/wordpress.wwfry.org\/"},{"@type":"ListItem","position":2,"name":"Build 11 &#8211; June Update"}]},{"@type":"WebSite","@id":"https:\/\/wordpress.wwfry.org\/#website","url":"https:\/\/wordpress.wwfry.org\/","name":"Wiscasset, Waterville &amp; Farmington Railway","description":"Rebuilding Maine History","publisher":{"@id":"https:\/\/wordpress.wwfry.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/wordpress.wwfry.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/wordpress.wwfry.org\/#organization","name":"Wiscasset, Waterville, and Farmington Railway Museum","url":"https:\/\/wordpress.wwfry.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wordpress.wwfry.org\/#\/schema\/logo\/image\/","url":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2019\/01\/WWF-Logo.jpg","contentUrl":"https:\/\/wordpress.wwfry.org\/wp-content\/uploads\/2019\/01\/WWF-Logo.jpg","width":480,"height":144,"caption":"Wiscasset, Waterville, and Farmington Railway Museum"},"image":{"@id":"https:\/\/wordpress.wwfry.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/WWFRailway","https:\/\/x.com\/WWFRailway","https:\/\/www.instagram.com\/WWFRailway\/","https:\/\/www.linkedin.com\/organization\/15554710","https:\/\/www.pinterest.com\/WWFRailway\/","https:\/\/www.youtube.com\/c\/WWFRailway","https:\/\/en.wikipedia.org\/wiki\/Wiscasset,_Waterville_and_Farmington_Railway"]},{"@type":"Person","@id":"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/80ee68ec9b0c4345f85bde573a02fb5c","name":"wp_admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/wordpress.wwfry.org\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/cf4000b05b6475a8130ddae7e713d249847d0aca668b58f3f39e07e33480a558?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cf4000b05b6475a8130ddae7e713d249847d0aca668b58f3f39e07e33480a558?s=96&d=mm&r=g","caption":"wp_admin"},"url":"https:\/\/wordpress.wwfry.org\/?author=1"}]}},"_links":{"self":[{"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/posts\/4076","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4076"}],"version-history":[{"count":3,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/posts\/4076\/revisions"}],"predecessor-version":[{"id":4082,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/posts\/4076\/revisions\/4082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=\/wp\/v2\/media\/4077"}],"wp:attachment":[{"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4076"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4076"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.wwfry.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4076"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}